深圳市贝德技术检测有限公司
Service Beide Service
Service Service

Lowe's factory inspection

Product introduction: Lowe's factory inspection Quality Audit ChecklistDuring factory certification, the assessor needs to review the following documents from your factory.  Please make them ready for review if you have these documents.  (一)Factory Layout Diagram(二)Last 12 months on time delivery statistical data(三)Last 12 months final pre-shipment quality audit statistical data(四)Recruitment1)    Guidelines for Recruitment2)    Job Description(五)Employee Training1)    Factory Rules and Regulations for Employees 2)    Training contents of skills required for Individual post 3)    Records of Employee Training(六)Quality System Policies and Operating Procedures1)  Factory Organization Chart2)  Roles and Responsibilities of Key persons in Quality Organization3)  Reporting channel for persons in Quality Department4)  Vendor selection procedures and quality assessment procedures5)  Vendor quality requirements and performance monitoring 6)  Operating procedures for individual Quality control stations 7)  Workmanship Acceptance/Rejection Criteria8)  Incoming material handling and non-conforming material return procedures9)  Nonconforming material handling procedures10) Defect analysis records and countermeasures monitoring11) Master schedule for internal quality system audit, reports of periodical internal quality system audit12) Improvement plan against periodical internal quality system audit results and countermeasures monitoring13)Equipment Calibration Plan14) Equipment Calibration Records15) Document control procedures (including product safety standards)16) Vendors quality performance records17) Machines preventive maintenance and repair procedures18) Barcode scanners and barcode verification procedures(七)Fire Safety Precaution Policies and Operating ProceduresWe expect the factory maintain a safe working environment with regular review and monitor on:- Sufficient fire fighting equipment are in place, e.g. fire extinguishers, water hydrants, emergency light and exit sign, evacuation diagram, etc. which meets PRC National Standard GBJ16-87 and GBJ140- All fire fighting equipment are under good working conditions- Sufficient emergency exits and unblocked passage- Segregation and proper storage of flammable chemicals, e.g. paints, thinner, etc.
Project introduction:
Application description:
Expected cycle:
Latest offers:
Lowe's factory inspection
  • Project description
  • Customer case
  • Certification application

Lowe's factory inspection

Quality Audit Checklist

During factory certification, the assessor needs to review the following documents from your factory.  Please make them ready for review if you have these documents.  

(一)Factory Layout Diagram


(二)Last 12 months on time delivery statistical data


(三)Last 12 months final pre-shipment quality audit statistical data


(四)Recruitment

1)    Guidelines for Recruitment

2)    Job Description


(五)Employee Training

1)    Factory Rules and Regulations for Employees

2)    Training contents of skills required for Individual post

3)    Records of Employee Training


(六)Quality System Policies and Operating Procedures

1)  Factory Organization Chart

2)  Roles and Responsibilities of Key persons in Quality Organization

3)  Reporting channel for persons in Quality Department

4)  Vendor selection procedures and quality assessment procedures

5)  Vendor quality requirements and performance monitoring

6)  Operating procedures for individual Quality control stations

7)  Workmanship Acceptance/Rejection Criteria

8)  Incoming material handling and non-conforming material return procedures

9)  Nonconforming material handling procedures

10) Defect analysis records and countermeasures monitoring

11) Master schedule for internal quality system audit, reports of periodical internal quality system audit

12) Improvement plan against periodical internal quality system audit results and countermeasures monitoring

13)Equipment Calibration Plan

14) Equipment Calibration Records

15) Document control procedures (including product safety standards)

16) Vendors quality performance records

17) Machines preventive maintenance and repair procedures

18) Barcode scanners and barcode verification procedures


(七)Fire Safety Precaution Policies and Operating Procedures

We expect the factory maintain a safe working environment with regular review and monitor on:

- Sufficient fire fighting equipment are in place, e.g. fire extinguishers, water hydrants, emergency light and exit sign, evacuation diagram, etc. which meets PRC National Standard GBJ16-87 and GBJ140

- All fire fighting equipment are under good working conditions

- Sufficient emergency exits and unblocked passage

- Segregation and proper storage of flammable chemicals, e.g. paints, thinner, etc.

Hot Products / Popular search: More
2018 - 02 - 28
1. Introduction to CE certificationThe 'CE' mark is a safety certification mark that is considered a passport for manufacturers to open and enter the European market. CE represents the logo of the European Unified CE Certification (CONFORMITE EUROPEENNE). All products with the 'CE' mark can be sold in various member states of the European Union without meeting the requirements of e...
2018 - 01 - 30
European UnionCE certification, EU ERP certification, EU REACH certification, EU RoHS certification, EU ENEC certificationGermanyTUV South German certification, German WEEE certification, German GS certificationBritainUK BSI Certification UK UKCA CertificationFranceFrench NF certificationNordic CountriesNordic Nordic CertificationNetherlandsKEMA certification in the NetherlandsAustriaAustria OVE c...
2017 - 06 - 09
Summary of Certification ContentThe predecessor of ASTM was the International Association for Testing Materials (IATM).In the 1880s, in order to resolve the opinions and disagreements between buyers and suppliers in the process of purchasing and selling industrial materials, some proposed the establishment of a technical committee system. The technical committee organized representatives from vari...
2017 - 06 - 09
Introduction to IEC CertificationThe IEC standard, also known as the International Electrical Commission, is a worldwide standardization organization composed of various countries' electrical committees. Its purpose is to promote standardization in the field of electrical and electronic technology worldwide. The origin of the International Electrotechnical Commission was a resolution passed at...
CONTACT US
WeChat
Official Account
Free consultation hotline
400-6288-211
Address: 6 / F, building e, hourui third industrial zone, Xixiang, Bao'an District, Shenzhen
Copyright ©2022 - 2025 Shenzhen Beide Technology Testing Co., Ltd
Rhino Cloud provides cloud computing services
var _kc_userID="169296";